Yang Fuying,Feng Xiaolin,Li Xiaoping
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 55-58
The structure of ship lift tower in Three Gorges Project, belonging tomeasures of temperature control and other measures at the same time, the construction quality of concrete towerTemperature control and crack prevention technology for concrete in ship lift tower of Three Gorges Projecthas important reference value to research the technical level of temperature control measures for shiplift projects at home and abroad, to improve the quality of concrete construction in hydropower projects
Keywords: ship lift tower concrete temperature control crack prevention Three Gorges Project ship lift
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 102-107
Keywords: Three Gorges Project ship lift tower column deformation monitoring total station polar coordinate
Weilian QU, Jianwei TU
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 1, Pages 32-41 doi: 10.1007/s11709-009-0003-8
Keywords: Three-Gorges ship lift tower whipping effect magnetorheological (MR) intelligent isolation system neural
Construction technology of tower column of Three Gorges Project ship lift
Zhou Jianhua
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 15-21
This paper firstly describes the whole construction program of the towerapplication of those construction techniques meets the requirement of high precision construction of the tower
Keywords: ship lift tower column construction techniques Three Gorges Project
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 22-26
The construction time limits for the tower column concrete of Three GorgesProject ship lift is pressed for time and require high accuracy.to meet the rising-up of self-climbing formwork on Three Gorges Project ship lift tower column concreteof the hydraulic self-climbing formwork construction technology meet the design requirements of the towercolumn cylinder concrete of the Three Gorges ship lift, effectively improve the construction efficiency
Keywords: tower concrete hydraulic self-climbing formwork concrete pouring Three Gorges Project ship lift
Beam supporting system design for Three Gorges Project ship lift tower
Zhu Junjie and Li Shihua
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 64-69
Keywords: ship lift tower beam Bailey rack supporting system Three Gorges Project
Concrete construction technology on tower beam of Three Gorges Project ship lift
Yu Ying
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 27-32
he concrete construction of the beam concrete of tower load-bearing structurein Three Gorges Project ship lift is difficult, with high-complexity and no mature technology availablebeam of the Three Gorges Project ship lift, the concrete construction technology for continued constructionof the Three Gorges Project ship lift top beam is summarized, which uses hierarchical, block pouringThe concrete construction practices of Three Gorges Project ship lift tower beam certify the effectiveness
Keywords: ship lift beam concrete construction joints pouring stratification Three Gorges Project
Zhou Xiong,Chen Zhanlong,Zhang Yuning
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 83-86
Keywords: Three Gorges Project ship lift construcion of tower column aerial work comprehensive lifting platform
Construction survey technology on concrete construction of Three Gorges Project ship lift tower
Luo Chen,Yan Chunbo
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 97-101
Three Gorges Project vertical ship lift is high-walled tower structureembedded parts in construction survey of concrete and built-in embedded parts of Three Gorges Project shiplift tower were studied.data, the construction survey technology solutions for concrete construction of Three Gorges Project shiplift tower are proved to be reliable and feasible.
Keywords: electromagnetic distance measuring spatial positioning measurement for casing Three Gorges Project shiplift
Construction summary of Three Gorges Project ship lift
Zhao Xijin
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 9-14
The ship lift of Three Gorges Project is huge and technically complex, and as there is no similar ship lift in the world as a precedent putting into operation, it has beenThe design and research process of Three Gorges Project ship lift , has been strongly supported by manylift .To reduce the effect of tower column deformation on the installation accuracy of rack and nutand reliable operation of ship lift.
Keywords: construction review ship lift Three Gorges Project
Support system load test of beam Bailey truss of Three Gorges Project ship lift
Wang Wenliang,Xiao Chuanyong,Zhang Junxia
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 50-54
During the continued construction of Three Gorges Project ship lift,pouring work of the beam concrete, which is aimed at the complex characteristics of the bracing system of towerparameters of strengthened Bailey trusses meet the safety requirements, and the proposal applies to the tower
Keywords: beam Bailey truss experiment Three Gorges Project ship lift
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 91-96
Keywords: Three Gorges Project ship lift rack nut column installation of control precision control
Shu CHEN, Menghan SHANG, Jianping WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 135-147 doi: 10.1007/s42524-020-0125-1
Keywords: vertical ship lift initial fire fire evacuation numerical simulation stair elevator
Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room
Sun Changzhong
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 33-39
Keywords: ship lift computer room steel roof truss design construction Three Gorges Project
Clearance grouting process test of Three Gorges Project ship lift rack and nut column
Zhan Jianxia and Li Jihu
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 45-49
Keywords: rack nut column grouting ship lift Three Gorges Project
Title Author Date Type Operation
Temperature control and crack prevention technology for concrete on ship lift tower of Three Gorges Project
Yang Fuying,Feng Xiaolin,Li Xiaoping
Journal Article
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Journal Article
Theoretical and experimental study on seismic response control on top of Three-Gorges ship lift towers
Weilian QU, Jianwei TU
Journal Article
Construction technology of tower column of Three Gorges Project ship lift
Zhou Jianhua
Journal Article
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Journal Article
Beam supporting system design for Three Gorges Project ship lift tower
Zhu Junjie and Li Shihua
Journal Article
Concrete construction technology on tower beam of Three Gorges Project ship lift
Yu Ying
Journal Article
Research and application of aerial comprehensive lifting platform of tower column of Three Gorges Projectship lift
Zhou Xiong,Chen Zhanlong,Zhang Yuning
Journal Article
Construction survey technology on concrete construction of Three Gorges Project ship lift tower
Luo Chen,Yan Chunbo
Journal Article
Support system load test of beam Bailey truss of Three Gorges Project ship lift
Wang Wenliang,Xiao Chuanyong,Zhang Junxia
Journal Article
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Journal Article
Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and
Shu CHEN, Menghan SHANG, Jianping WANG
Journal Article
Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room
Sun Changzhong
Journal Article